1. 4x the speed of the fastest USB connection. Thunderbolt 3 is capable of transmitting at a rate of 40Gbps, which is a lot quicker than USB 3.1's rate of 10Gbps or USB 3.0's limit of 5Gbps. It's this is a port charges applicable to all laden container for both exports and imports payable by shipper / consignee. this charges will be billed by feeder operator directly to shipper / consignee quantum all trades wef:-14th jan 2021 (pudo dry) 1st july 2021 (pudo reefer) Use the left 2 lanes to take the exit towards Port of Miami Tunnel and follow the signs for your pier terminal. Via Port Bridge: Take I-95 South to Exit 3B, N.W. 8th Street. Turn left onto 5th Street and continue straight until you reach the Port of Miami entrance. Drive across the bridge and follow signs to your pier terminal. CHARGES. The Authority Dray of Containers or Chassis between Intermodal Rail Facility and Container Yard, per container. This rate is only applicable to chassis/containers with a prior or subsequent vessel move via Georgia Ports Authority Terminals. $79.00. Early Arrival Facilitation Fee. Cost, Insurance and Freight - CIF: Cost, Insurance and Freight (CIF) means the seller pays costs, freight and insurance against the buyer's risk of loss or damage in transit to destination. B. CHARGES ON CARGOES 1. All non-containerized foreign cargoes coming in (imported), going out (exported) or transhipped through a government-owned wharf shall be charged WHARFAGE for the use of port facilitiees on the basis of the total metric or revenue tonnage whichever is applicable, rounded off to the nearest ton, as follows: .

port to port charges